Killington Resort expressed interest in the specialized DI piping systems from TRM, for a high pressure waste water system being considered between Killington and Pico. Design Engineers for Killington were interested this specialized DI pipe from TRM for several reasons: Initially, because the pipe from TRM was supplied with high […]
Steamboat has to complete emergency repair of damaged DI pipe system.
October 11, 2016, Steamboat contacted PNP Supply to advise that a section of their existing DI pipe system had been damaged by a contractor working on another project on the mountain. This damaged pipe had to be repaired quickly. PNP Supply worked with a broad client base, and used the […]
Howelsen Hill installs TRM pipe in base area, in wet highly corrosive soils.
In late August 2016 Howelsen Hill decided to replace a short stretch welded steel pipe which had been installed through a section of the base area where drainage from sulfur springs passed. This steel pipe had been “band-aid” repaired several times during the past 2-3 operating seasons. PNP was able […]